in line 13, has entered the station decoration installation phase. Cheap Cardinals Jerseys This reporter recently visited the Changshou Road Cheap Lions Jerseys station, line 13 and line 7 transfer hall has started construction. According to the subway plan, the first phase of line 13 will be opened by the end of 4 stations, while passengers on Dadu River Road station, the station in Changshou Road after the opening of "ban", opened simultaneously.
reporter in line 13 Cheap Falcons Jerseys Changshou Road station underground site to see, the long distance station hall, the platform is formed, only the construction team stationed, began to line, shielding door, escalators and other installation. Underground 1 layer intersects with the 7 lines cross transfer hall have closed began the transformation. "Changshou Road station exit 7, the corresponding sub new life square, the biggest, the future from here down, walk 2-3 minutes can sit on the 13 line." Site construction personnel. It is reported, the Metro Line 13 Changshou Road station construction is expected to be completed in 9-10 months, then will start debugging, at the end of the train operation, opening with the line 7 transfer to lay a good foundation.
subway tunnel space said, greater Changshou Road station opened at the end, Dadu Road station will Cheap Jaguars Jerseys be the "ban", the synchronous operation. It is reported, 13 lines first phase East, West will be opened by the Cheap 49ers Jerseys end of the Dadu River Road, Longde Road, Wuning Road, Changshou Road four stations. At this point, line 13 will be a farewell present only and 1 rail lines is the status line 4 transfer, added with 7, the change of 11 lines, further shunt Jinsha River road line 13 and line 4 transfer large passenger flow, so that the residents of Baoshan, Pudong and other regions, more convenient to take the No. 13 line.
没有评论:
发表评论